Home  >  Media center   >   News
News

New tower in Haikou Meilan Intl Airport put into use

ehainan.gov.cn | Updated: 2021-11-30
咪乐|直播|安卓版 最新版   国家信访局党组副书记、副局长张恩玺介绍,近年来,各地各级信访部门紧紧围绕及时就地解决问题这一主线,创新方法,完善机制,抓实工作,推动形成“群众依法就地访、部门依法及时办”的良好态势,依法逐级走访取得明显效果。

112201.jpg

A plane flies by the new tower at Haikou Meilan International Airport on Nov 19, 2021. [Photo/VCG]

On Nov 20, the new tower of Haikou Meilan International Airport was officially put into use. It will be responsible for managing the airport's two runways.

The new tower is 108 meters tall, nearly 42 meters taller than the original tower, thus greatly improving visibility. The radio signal is also unobstructed and has better coverage.

The new tower has a total of 22 floors. The control room is located on the 22nd floor and is a 360-degree panoramic structure. It acts as the "brain" of the airport, and is the information interaction center for flight command.

The tower will increase the capacity and operation efficiency of flights, allow for a flight to take off or land every two minutes, and provide safe and reliable air traffic control protection for the second phase of Meilan Airport.

The new tower is able to meet the demands of the airport's planned throughput of 35 million passengers and annual cargo and mail throughput of 400,000 metric tons by 2025, and will also benefit the construction of Hainan Free Trade Port.

百度